Hook
More breakout videos from this creator.
The steel track for my backyard rollercoaster will be 100% installed in 5 days. Right now, I've only built the support frames for this section of the coaster. Nowhere else. So how am I expecting to put the entire track up? Well, the same guys who helped me build the steel track are coming to California for only 2 days And our goal is to have the entire track installed before they go back home. What we'll do is attach the rails to all of the existing frames and once we get here, build a new support frame every 8 feet until the entire track is standing. To get a head start I've already moved the first 17 pieces of track into position. These things are pretty heavy, so I've been using my Super Handy wagon to move them around the backyard. Lowkey, this thing saved my back. So thank you Super Handy. I love you! So make sure to drop a follow if you wanna see this backyard roller coaster come to life.